Monday, October 1, 2007

Bathroom Remodel Day 5 and beyond

We're moving along slllooowwwly, but we're getting super close to being DONE!

Here's Day 5....most of the tile is in place, we're anxious to see what it will look like once the grout and trim pieces are in place:








And here we are after days 6 and 7.... a wee bit more tile and grout later and now we're talkin':






And after day 8 (Friday Sept. 28th), Mark and I are getting more and more impressed with our design! It's actually starting to look like a bathroom! We're getting so close





Since the last pictures were taken, the only change is the arch above the opening to the water closet is back. Now we'll contiue to wait for the plumber and electrician to show up, and after that all that's left is patching, taping, floating and texturing the walls, and getting the glass enclosure installed around the shower. That's IT! We are now in to week 6 of the remodel.

As for the wood floors...nothing has changed. They were supposed to start demo this morning, but it's not much of a surprise that I came home to an empty house with no changes. PLEASE LET ME KEEP MY PATIENCE with these people!!!!!!


I'm hoping to find some more time to update with all of the recent happenings at the Urben house as soon as possible. Right now, I'm off to the dentist AGAIN, but this time for some relief. I'm pretty sure I have dry socket from the molar I had pulled last Thursday. I'll be feelin' good in no time, I'm sure!